Stadium wiring setup
For a new or renovated track, the Installation Resources page has everything to hand your architect or contractor: the track plan, Power-over-Ethernet, and the three standard layouts. The Lynx Track Architects Brochure is the printable version.
All cables and connectors are industry standard, so most licensed electrical contractors can install them. A Lynx package already runs as a closed network above ground and only needs power; permanent infrastructure adds computers in the press box, cables underground, and a finish line that can move when the wind turns.
How to fix it
Where the junction boxes go
- A pair of weatherproof boxes inside and outside the track at the primary finish line, joined by conduit under the track. This pair matters most, and the one inside the track gets the most use.
- Choose boxes with drainage or an open bottom so water can't build up (Gill VersaCom boxes are a common choice), and keep power and communication cables separate inside.
- For alternate finish lines, add box pairs at the 100 m and 200 m starts, with conduit from the finish line along the straight and across the track, so the sprints can run the other way in a headwind.
- Run at least three 2" (50 mm) conduits at the finish line, with sweep elbows and no sharp bends where fiber will go. The spare conduit gives redundancy and room to expand.
The essentials to pull
- Cameras run on PoE+: one Ethernet cable from a PoE+ switch or injector carries power and data. Cat6 is recommended, Cat5 is the minimum. See Choosing a cable.
- Over about 300 ft, such as press box to finish line, use fiber with a media converter at each end, and give the press box a dedicated AC circuit.
- Provide AC power wherever a PoE+ switch or injector, a fiber converter, a scoreboard or the FinishLynx computer may go.
- Permanent start cabling is optional. Every Lynx package includes a 500 ft start cable and many include RadioLynx wireless start, so XLR-3 cabling to every junction box is usually more than a track needs.
Start cable wiring
If you do install permanent wired start cabling to the start locations, use shielded 3-conductor cable with XLR-3 connectors:
- Pin 1 — Ground (Wire: Black)
- Pin 2 — 12V DC (Wire: White)
- Pin 3 — Data (Wire: Red)